1

High-Efficiency 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Project Summary Newsome has recently completed the installation and commissioning of a high-performance 400 kW chiller at a leading confectionery manufacturing site in York. This initiative reflects a notable step forward in the client’s Environmental, Social and Governance commitments, enhancing manufacturing reliability and ensuring measurable reductions in both power usage https://bookmarksknot.com/story22673618/high-efficiency-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story