1

Advanced 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Project Summary Newsome has recently completed the installation and commissioning of a high-performance 400 kW chiller at a leading confectionery manufacturing site in York. Designed to strengthen ESG targets, the installation improves system dependability while minimising overall energy usage and CO₂ emissions. https://letusbookmark.com/story22617771/energy-efficient-400-kw-chiller-installation-secures-50-000-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-reduction

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story