Put in the Coir Matting in the trench. Put not less than 12 inches with the roll higher than the trench (even further up the slope). Space Each individual staple a few foot aside Within the trench Positioning: Location the coir logs in the waterline or alongside the edge from https://coir-mats49023.bloguetechno.com/the-single-best-strategy-to-use-for-coir-mats-69111197