The main park has a potential of two hundred MW whilst Sandrini II has a capacity of 100 MW. The overall cost of each initiatives were not disclosed on the other hand, for the duration of construction, in excess of two hundred personnel ended up utilized. The tasks are expected https://solarinstallerscalifornia.blogspot.com/2024/12/how-to-save-more-on-your-monthly-energy.html