“Consist of and become educated by a ground investigation study which establishes the soil qualities, infiltration level and groundwater concentrations and would kind part of the overall suds evaluation”; and Lay the DTp1 hardcore sub-foundation, making sure it is compacted as well as. It ought to be 150mm in depth https://vivconstruct.com